Foundation Design Submittal
Created: 2024-01-10
|
Sent: 2024-01-12
|
Review Due: 2024-01-20 (8 days left)
|
Feedback: 30%
Feedback Progress
▼3 items reviewed, 7 pending
Submittal Items 10
▼Item 1: Foundation Design Package
24 pg
Reviewed
Item 2: Structural Steel Drawings
18 pg
Reviewed
Item 3: MEP Coordination Plans
12 pg
Reviewed
Item 4: Facade Detail Sheets
8 pg
Pending
Item 5: Wind Load Calculations
6 pg
Pending
Item 6: Foundation Specs
4 pg
Pending
Item 7: Waterproofing Details
3 pg
Pending
Item 8: Rebar Schedules
10 pg
Pending
Item 9: Concrete Mix Designs
5 pg
Pending
Item 10: Quality Control Checklist
2 pg
Pending
Notes
▼
Architectural documentation for the foundation design of Marina Bay Complex. Includes all structural calculations, steel design drawings, and MEP coordination plans. Client review deadline: 2024-01-20.
Feedback by Item 10
▼| Item | Status | Comments | Reviewer |
|---|---|---|---|
| Item 1: Foundation Design Package | Approved | No issues found | Sara N. |
| Item 2: Structural Steel Drawings | Approved | Minor corrections noted | Omar K. |
| Item 3: MEP Coordination Plans | Approved | Approved with conditions | Ahmed H. |
| Item 4: Facade Detail Sheets | Pending | — | — |
| Item 5: Wind Load Calculations | Pending | — | — |
| Item 6: Foundation Specs | Pending | — | — |
| Item 7: Waterproofing Details | Pending | — | — |
| Item 8: Rebar Schedules | Pending | — | — |
| Item 9: Concrete Mix Designs | Pending | — | — |
| Item 10: Quality Control Checklist | Pending | — | — |