3
DL
Devon L.
SUB-001 Sent Design

Foundation Design Submittal

Created: 2024-01-10
|
Sent: 2024-01-12
|
Review Due: 2024-01-20 (8 days left)
|
Feedback: 30%
Items 10
Feedback 3/10
Re-submission Required: Client feedback indicates structural revisions needed.
View Details

Feedback Progress

30%
3 items reviewed, 7 pending

Submittal Items 10

Item 1: Foundation Design Package
Ref: FDP-001
24 pg Reviewed
Item 2: Structural Steel Drawings
Ref: SSD-001
18 pg Reviewed
Item 3: MEP Coordination Plans
Ref: MCP-001
12 pg Reviewed
Item 4: Facade Detail Sheets
Ref: FDS-001
8 pg Pending
Item 5: Wind Load Calculations
Ref: WLC-001
6 pg Pending
Item 6: Foundation Specs
Ref: FS-001
4 pg Pending
Item 7: Waterproofing Details
Ref: WD-001
3 pg Pending
Item 8: Rebar Schedules
Ref: RS-001
10 pg Pending
Item 9: Concrete Mix Designs
Ref: CMD-001
5 pg Pending
Item 10: Quality Control Checklist
Ref: QCC-001
2 pg Pending

Notes

Architectural documentation for the foundation design of Marina Bay Complex. Includes all structural calculations, steel design drawings, and MEP coordination plans. Client review deadline: 2024-01-20.

Feedback by Item 10

Item Status Comments Reviewer
Item 1: Foundation Design Package Approved No issues found Sara N.
Item 2: Structural Steel Drawings Approved Minor corrections noted Omar K.
Item 3: MEP Coordination Plans Approved Approved with conditions Ahmed H.
Item 4: Facade Detail Sheets Pending
Item 5: Wind Load Calculations Pending
Item 6: Foundation Specs Pending
Item 7: Waterproofing Details Pending
Item 8: Rebar Schedules Pending
Item 9: Concrete Mix Designs Pending
Item 10: Quality Control Checklist Pending