Setup Detail
RK
Revision History
RFQ-2024-001 — Office Tower A
Deliverable Selection
Estimation Parameters
LOD 400
LOD 500
QTO
BEP
COBie
Asset Data
4D
5D
GIS
BOQ
On-site
Off-site
Sheet SizeLevel 1Level 2Level 3
A0
A1
Sheet SizeLevel 1Level 2Level 3
A0
A1
Calculation Mode
Man-months = LOD 400 Total × 5% = 0.15
Inherited from LOD 400
Calculation Mode
Man-months = LOD 400 Total × 3% = 0.09
Calculation Mode
Man-months = LOD 400 Total × 4% = 0.12
Inherited from LOD 400
Inherited from LOD 400
Inherited from LOD 400
Calculation Mode
Man-months = LOD 400 Total × 5% = 0.15
Estimation Summary
Man-months (Modeler)
3.0
Man-months (Coordinator)
1.5
Total Man-months
4.5
Modeler + Coordinator
Total Price
$12,300
Modeler + Coordinator
Sheets / Man-month
10.0
45 sheets ÷ 4.5 MM
Avg Hours / Sheet
17.6
Total Sheets
45
Sheet Size
A1
Packages & Sub-Packages Drag to reorder
Package Sub-packages Sheets Status
⠿ Architecture Floor Plans, Elevations, Sections, Details 18 Active
⠿ Structure (Concrete) Foundation, Columns, Beams, Slabs 12 Active
⠿ MEP HVAC, Electrical, Plumbing, Fire 15 Pending
Engineer Assignment
P1
P2
P3
EngineerActive RFQsTotal SheetsCurrent Stages
Sarah Johnson3147LOD 400, QTO, BEP
Mike Chen289LOD 400, BEP
Lisa Rodriguez156QTO
Amir Patel00—