Setup Detail
RK
Revision History
RFQ-2024-001 — Office Tower A
Deliverable Selection
Estimation Parameters
LOD 400
LOD 500
QTO
BEP
COBie
Asset Data
4D
5D
GIS
BOQ
On-site
Off-site
Sheet SizeLevel 1Level 2Level 3
A0
A1
Sheet SizeLevel 1Level 2Level 3
A0
A1
Calculation Mode
Man-months = LOD 400 Total × 5% = 0.15
Inherited from LOD 400
Calculation Mode
Man-months = LOD 400 Total × 3% = 0.09
Calculation Mode
Man-months = LOD 400 Total × 4% = 0.12
Inherited from LOD 400
Inherited from LOD 400
Inherited from LOD 400
Calculation Mode
Man-months = LOD 400 Total × 5% = 0.15
Estimation Summary
Man-months (Modeler)
3.0
Man-months (Coordinator)
1.5
Total Man-months
4.5
Modeler + Coordinator
Total Price
$12,300
Modeler + Coordinator
Sheets / Man-month
10.0
45 sheets ÷ 4.5 MM
Avg Hours / Sheet
17.6
Total Sheets
45
Sheet Size
A1
Packages & Sub-Packages Drag to reorder
Package Sub-packages Sheets Status
Architecture Floor Plans, Elevations, Sections, Details 18 Active
Structure (Concrete) Foundation, Columns, Beams, Slabs 12 Active
MEP HVAC, Electrical, Plumbing, Fire 15 Pending
Engineer Assignment
P1
P2
P3
EngineerActive RFQsTotal SheetsCurrent Stages
Sarah Johnson3147LOD 400, QTO, BEP
Mike Chen289LOD 400, BEP
Lisa Rodriguez156QTO
Amir Patel00