Estimation Window
JES-2026-0044 · Emaar Properties
AK
JES-2026-0044
Emaar Properties
Dubai Creek Tower
Estimating
RFQ Summary
RFQ Type:Tender
Priority:P1
Engineer:Ahmed K.
Currency:AED
Typology:High-Rise Commercial
Received:Feb 18, 2026
Deliverables in Scope
LOD 400
LOD 500
QTO
BEP
COBie
4D (Time & Schedule)
5D (Cost & Estimation)
GIS (Geographical Information System)
BOQ
On-site Modeler
On-site BIM Management
Off-site BIM Management
Revision
Rev:2
Internal:0
Timeline
Assigned:Feb 20
SLA Due:Feb 28
Days Left:1
You are viewing this estimation as read-only. The assigned engineer (Ahmed K.) is actively working on this RFQ.
⚠ Rework Requested Technical
From: Raj Kumar (EM) · Feb 26, 2026
Sheet counts for Tower A Typical Floors appear too low — 18 MEP sheets for 17 floors doesn't account for unique floor layouts on levels 4–6. Please review the MEP scope and update counts. Also verify structural reinforcement complexity for podium levels.
Package Structure
Indoor Water Activity
Basement
Ground Level
Catwalk Level
Lower Level
Roof Level
Olympic Pool
Basement
Ground Level
Roof Level
Modeler Parameters
Modeler Man-month Value AED 7,500
Rate / Hour AED 42.61
Days / Man-month 22
Coordinator Parameters
Coordination % 33%
Coordinator Man-month Value AED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
Package Sub-Package Discipline Sub-Discipline Sheet Category Count Size Level Hrs/Sheet Hours/Drawing Manhours Sheets/Man-month Actions
Indoor Water Activity 27 sheets · 666.0 manhours
Basement 3 sheets · 54.0 hrs
Indoor Water Activity Basement Architectural Blockwall Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Indoor Water Activity Basement Architectural Interiors Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Indoor Water Activity Basement Architectural Facade Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Ground Level 9 sheets · 198.0 hrs
Indoor Water Activity Ground Level Architectural Blockwall Floor Plan 3 A1 Manual 18.0 18.0 54.0 Edit
Indoor Water Activity Ground Level Architectural Interiors Floor Plan 3 A1 Manual 18.0 18.0 54.0 Edit
Indoor Water Activity Ground Level Architectural Facade Floor Plan 3 A1 Manual 22.0 22.0 66.0 Edit
Catwalk Level 6 sheets · 120.0 hrs
Indoor Water Activity Catwalk Level Architectural Blockwall Floor Plan 3 A1 Manual 18.0 18.0 54.0 Edit
Indoor Water Activity Catwalk Level Architectural Facade Floor Plan 3 A1 Manual 22.0 22.0 66.0 Edit
Lower Level 6 sheets · 120.0 hrs
Indoor Water Activity Lower Level Architectural Blockwall Floor Plan 3 A1 Manual 18.0 18.0 54.0 Edit
Indoor Water Activity Lower Level Architectural Facade Floor Plan 3 A1 Manual 22.0 22.0 66.0 Edit
Roof Level 3 sheets · 54.0 hrs
Indoor Water Activity Roof Level Architectural Blockwall Floor Plan 3 A1 Manual 18.0 18.0 54.0 Edit
Indoor Water Activity — Subtotal 27 666.0
Olympic Pool 12 sheets · 228.0 manhours
Basement 4 sheets · 72.0 hrs
Olympic Pool Basement Architectural Blockwall Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Basement Architectural Interiors Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Basement Architectural Facade Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Basement Architectural Exteriors Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Ground Level 4 sheets · 78.0 hrs
Olympic Pool Ground Level Architectural Blockwall Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Ground Level Architectural Interiors Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Ground Level Architectural Facade Floor Plan 1 A1 Manual 22.0 22.0 22.0 Edit
Olympic Pool Ground Level Architectural Exteriors Floor Plan 1 A1 Manual 20.0 20.0 20.0 Edit
Roof Level 4 sheets · 78.0 hrs
Olympic Pool Roof Level Architectural Blockwall Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Roof Level Architectural Interiors Floor Plan 1 A1 Manual 18.0 18.0 18.0 Edit
Olympic Pool Roof Level Architectural Facade Floor Plan 1 A1 Manual 22.0 22.0 22.0 Edit
Olympic Pool Roof Level Architectural Exteriors Floor Plan 1 A1 Manual 20.0 20.0 20.0 Edit
Olympic Pool — Subtotal 12 228.0
Grand Total 39 894.0
Add Line Item
LOD 400 Total Sheets Manhours Man-months MM Value Total Price Hrs/Drawing Rate/Drawing Sheets/MM
Modeler 39 894 4.25 7,500 AED 31,875 21.40 79.05 9.18
Coordinator 39 247 1.40 10,000 AED 14,000 6.33 23.40 27.86
Mod + Coord 39 1,141 5.65 AED 45,875 29.26 6.90
QTO is manually calculated: Man-months × Modeler Man-month Value. The man-month value will vary per project.
QTOManhoursMan-monthsMM ValueTotal Cost
Total5283.006,000$18,000.00
BEP — Total Price is manual entry. Editable before, during & after completion.
BEPTotal Cost
Total$10,000.00
COBie is manually calculated: Man-months × Modeler Man-month Value. The man-month value will vary per project.
COBieManhoursMan-monthsMM ValueTotal Cost
Total00.005,000$0.00
Asset Data is manually calculated: Man-months × Modeler Man-month Value. The man-month value will vary per project.
Asset DataManhoursMan-monthsMM ValueTotal Cost
Total00.004,500$0.00

On-site Modeler deployment — manual entry. No package-wise breakdown needed.

On-site Modeler Qty Manhours Man-months MM Value Total Price
Modeler 1 0 0.00 8,000 0.00
Total 1 0 0.00 0.00

On-site Coordinator deployment — manual entry. No package-wise breakdown needed.

On-site Coordinator Manhours Man-months MM Value Total Price
Coordinator 0 0.00 10,000 0.00
Total 0 0.00 0.00

Off-site Modeler deployment — manual entry. No package-wise breakdown needed.

Off-site Modeler Qty Manhours Man-months MM Value Total Price
Modeler 1 0 0.00 6,000 0.00
Total 1 0 0.00 0.00

Off-site Coordinator deployment — manual entry. No package-wise breakdown needed.

Off-site Coordinator Manhours Man-months MM Value Total Price
Coordinator 0 0.00 10,000 0.00
Total 0 0.00 0.00
Modeler Parameters
Modeler Man-month ValueAED 7,500
Rate / HourAED 42.61
Days / Man-month22
Coordinator Parameters
Coordination %33%
Coordinator Man-month ValueAED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases

No LOD 200 line items added yet. Use the Add Line Item form below to start building the estimation.

LOD 200Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.007,5000.00
Coordinator000.0010,0000.00
Mod + Coord000.000.00
Modeler Parameters
Modeler Man-month ValueAED 7,500
Rate / HourAED 42.61
Days / Man-month22
Coordinator Parameters
Coordination %33%
Coordinator Man-month ValueAED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases

No LOD 300 line items added yet. Use the Add Line Item form below to start building the estimation.

LOD 300Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.007,5000.00
Coordinator000.0010,0000.00
Mod + Coord000.000.00
Modeler Parameters
Modeler Man-month ValueAED 7,500
Rate / HourAED 42.61
Days / Man-month22
Coordinator Parameters
Coordination %33%
Coordinator Man-month ValueAED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases

No LOD 350 line items added yet. Use the Add Line Item form below to start building the estimation.

LOD 350Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.007,5000.00
Coordinator000.0010,0000.00
Mod + Coord000.000.00
Modeler Parameters
Modeler Man-month ValueAED 7,500
Rate / HourAED 42.61
Days / Man-month22
Coordinator Parameters
Coordination %33%
Coordinator Man-month ValueAED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases

No LOD 500 line items added yet. Use the Add Line Item form below to start building the estimation.

LOD 500Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.007,5000.00
Coordinator000.0010,0000.00
Mod + Coord000.000.00
4D (Time & Schedule)ManhoursMan-monthsMM ValueTotal Price
4D Specialist1,5849.007,50067,500.00
Total1,5849.0067,500.00
5D (Cost & Estimation)ManhoursMan-monthsMM ValueTotal Price
5D Specialist1,0566.007,50045,000.00
Total1,0566.0045,000.00
GIS Parameters
Calc Mode Man-month Based
Man-months Allocated
Man-month Value
GIS (Geographical Information System) uses man-month based entry. Enter hours per sheet directly for each line item.

No line items yet. Use the form below to add line items.

Add Line Item
GISTotal SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.000.00
Coordinator000.000.00
Mod + Coord000.000.00
BOQ is manually calculated: Manhours (manual entry) → Manmonths (auto) × Manmonth Value = Total Price
BOQManhoursMan-monthsMM ValueTotal Cost
Total00.006,000$0.00
On-site BIM Management Manhours Man-months MM Value Total Price
BIM Manager 0 0.00 10,000 0.00
Total 0 0.00 0.00
Off-site BIM Management Manhours Man-months MM Value Total Price
BIM Manager 0 0.00 10,000 0.00
Total 0 0.00 0.00
Assumptions & Notes
At least one assumption is required before marking the estimation as complete.