You are viewing this estimation as read-only. The assigned engineer (Ahmed K.) is actively working on this RFQ.
From: Raj Kumar (EM) · Feb 26, 2026
Sheet counts for Tower A Typical Floors appear too low — 18 MEP sheets for 17 floors doesn't account for unique floor layouts on levels 4–6. Please review the MEP scope and update counts. Also verify structural reinforcement complexity for podium levels.
LOD 400
LOD 200
LOD 300
LOD 350
LOD 500
QTO
BEP
COBie
Asset Data
4D (Time & Schedule)
5D (Cost & Estimation)
GIS
BOQ
On-site Modeler
On-site Coordinator Deployment
On-site BIM Management
Off-site Modeler
Off-site Coordinator Deployment
Off-site BIM Management
Modeler Man-month Value
AED 7,500
Rate / Hour
AED 42.61
Days / Man-month
22
Coordinator Parameters
Edit
Coordination %
33%
Coordinator Man-month Value
AED 10,000
Hours per Sheet Rate Matrix
Edit
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
Detail View
Overview Table
Package
Sub-Package
Floor Plan
Elevation
Sections
Enlarged Plan
Typical Details
Total Sheets
Total Hrs
Indoor Water Activity
Basement
3 — — — —
3 54.0
Ground Level
9 — — — —
9 198.0
Catwalk Level
6 — — — —
6 120.0
Lower Level
6 — — — —
6 120.0
Roof Level
3 — — — —
3 54.0
Indoor Water Activity — Total
27 — — — —
27 666.0
Olympic Pool
Basement
4 — — — —
4 72.0
Ground Level
4 — — — —
4 78.0
Roof Level
4 — — — —
4 78.0
Olympic Pool — Total
12 — — — —
12 228.0
Grand Total
39 — — — —
39 894.0
Package
All Packages
Indoor Water Activity
Olympic Pool
Sub-Package
All Sub-Packages
Basement
Ground Level
Catwalk Level
Lower Level
Roof Level
Discipline
All Disciplines
Architectural
Structural
MEP
Interior Design & Joinery
Landscape
Infrastructure
Civil
Sub-Discipline
All Sub-Disciplines
Blockwall
Interiors
Facade
Exteriors
Clear Filters
Package
Sub-Package
Discipline
Sub-Discipline
Sheet Category
Count
Size
Level
Hrs/Sheet
Hours/Drawing
Manhours
Sheets/Man-month
Actions
Indoor Water Activity
Basement
Architectural
Blockwall
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Indoor Water Activity
Basement
Architectural
Interiors
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Indoor Water Activity
Basement
Architectural
Facade
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Indoor Water Activity
Ground Level
Architectural
Blockwall
Floor Plan
3
A1
Manual
18.0
18.0
54.0
—
Edit
Indoor Water Activity
Ground Level
Architectural
Interiors
Floor Plan
3
A1
Manual
18.0
18.0
54.0
—
Edit
Indoor Water Activity
Ground Level
Architectural
Facade
Floor Plan
3
A1
Manual
22.0
22.0
66.0
—
Edit
Indoor Water Activity
Catwalk Level
Architectural
Blockwall
Floor Plan
3
A1
Manual
18.0
18.0
54.0
—
Edit
Indoor Water Activity
Catwalk Level
Architectural
Facade
Floor Plan
3
A1
Manual
22.0
22.0
66.0
—
Edit
Indoor Water Activity
Lower Level
Architectural
Blockwall
Floor Plan
3
A1
Manual
18.0
18.0
54.0
—
Edit
Indoor Water Activity
Lower Level
Architectural
Facade
Floor Plan
3
A1
Manual
22.0
22.0
66.0
—
Edit
Indoor Water Activity
Roof Level
Architectural
Blockwall
Floor Plan
3
A1
Manual
18.0
18.0
54.0
—
Edit
Indoor Water Activity — Subtotal
27
666.0
Olympic Pool
Basement
Architectural
Blockwall
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Basement
Architectural
Interiors
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Basement
Architectural
Facade
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Basement
Architectural
Exteriors
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Ground Level
Architectural
Blockwall
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Ground Level
Architectural
Interiors
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Ground Level
Architectural
Facade
Floor Plan
1
A1
Manual
22.0
22.0
22.0
—
Edit
Olympic Pool
Ground Level
Architectural
Exteriors
Floor Plan
1
A1
Manual
20.0
20.0
20.0
—
Edit
Olympic Pool
Roof Level
Architectural
Blockwall
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Roof Level
Architectural
Interiors
Floor Plan
1
A1
Manual
18.0
18.0
18.0
—
Edit
Olympic Pool
Roof Level
Architectural
Facade
Floor Plan
1
A1
Manual
22.0
22.0
22.0
—
Edit
Olympic Pool
Roof Level
Architectural
Exteriors
Floor Plan
1
A1
Manual
20.0
20.0
20.0
—
Edit
Olympic Pool — Subtotal
12
228.0
Grand Total
39
894.0
LOD 400
Total Sheets
Manhours
Man-months
MM Value
Total Price
Hrs/Drawing
Rate/Drawing
Sheets/MM
Modeler
39
894
4.25
7,500
AED 31,875
21.40
79.05
9.18
Coordinator
39
247
1.40
10,000
AED 14,000
6.33
23.40
27.86
Mod + Coord
39
1,141
5.65
—
AED 45,875
29.26
—
6.90
QTO is manually calculated: Man-months × Modeler Man-month Value. The man-month value will vary per project.
QTO Manhours Man-months MM Value Total Cost
Total 528 3.00 6,000 $18,000.00
BEP — Total Price is manual entry. Editable before, during & after completion.
BEP Total Cost
Total $10,000.00
COBie is manually calculated: Man-months × Modeler Man-month Value. The man-month value will vary per project.
COBie Manhours Man-months MM Value Total Cost
Total 0 0.00 5,000 $0.00
Asset Data is manually calculated: Man-months × Modeler Man-month Value. The man-month value will vary per project.
Asset Data Manhours Man-months MM Value Total Cost
Total 0 0.00 4,500 $0.00
On-site Modeler deployment — manual entry. No package-wise breakdown needed.
On-site Modeler
Qty
Manhours
Man-months
MM Value
Total Price
Modeler
1
0
0.00
8,000
0.00
Total
1
0
0.00
—
0.00
On-site Coordinator deployment — manual entry. No package-wise breakdown needed.
On-site Coordinator
Manhours
Man-months
MM Value
Total Price
Coordinator
0
0.00
10,000
0.00
Total
0
0.00
—
0.00
Off-site Modeler deployment — manual entry. No package-wise breakdown needed.
Off-site Modeler
Qty
Manhours
Man-months
MM Value
Total Price
Modeler
1
0
0.00
6,000
0.00
Total
1
0
0.00
—
0.00
Off-site Coordinator deployment — manual entry. No package-wise breakdown needed.
Off-site Coordinator
Manhours
Man-months
MM Value
Total Price
Coordinator
0
0.00
10,000
0.00
Total
0
0.00
—
0.00
Modeler Man-month Value AED 7,500
Rate / Hour AED 42.61
Days / Man-month 22
Coordinator Parameters
Edit
Coordination % 33%
Coordinator Man-month Value AED 10,000
Hours per Sheet Rate Matrix
Edit
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No LOD 200 line items added yet. Use the Add Line Item form below to start building the estimation.
LOD 200 Total Sheets Manhours Man-months MM Value Total Price Hrs/Drawing Rate/Drawing Sheets/MM
Modeler 0 0 0.00 7,500 0.00 — — —
Coordinator 0 0 0.00 10,000 0.00 — — —
Mod + Coord 0 0 0.00 — 0.00 — — —
Modeler Man-month Value AED 7,500
Rate / Hour AED 42.61
Days / Man-month 22
Coordinator Parameters
Edit
Coordination % 33%
Coordinator Man-month Value AED 10,000
Hours per Sheet Rate Matrix
Edit
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No LOD 300 line items added yet. Use the Add Line Item form below to start building the estimation.
LOD 300 Total Sheets Manhours Man-months MM Value Total Price Hrs/Drawing Rate/Drawing Sheets/MM
Modeler 0 0 0.00 7,500 0.00 — — —
Coordinator 0 0 0.00 10,000 0.00 — — —
Mod + Coord 0 0 0.00 — 0.00 — — —
Modeler Man-month Value AED 7,500
Rate / Hour AED 42.61
Days / Man-month 22
Coordinator Parameters
Edit
Coordination % 33%
Coordinator Man-month Value AED 10,000
Hours per Sheet Rate Matrix
Edit
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No LOD 350 line items added yet. Use the Add Line Item form below to start building the estimation.
LOD 350 Total Sheets Manhours Man-months MM Value Total Price Hrs/Drawing Rate/Drawing Sheets/MM
Modeler 0 0 0.00 7,500 0.00 — — —
Coordinator 0 0 0.00 10,000 0.00 — — —
Mod + Coord 0 0 0.00 — 0.00 — — —
Modeler Man-month Value AED 7,500
Rate / Hour AED 42.61
Days / Man-month 22
Coordinator Parameters
Edit
Coordination % 33%
Coordinator Man-month Value AED 10,000
Hours per Sheet Rate Matrix
Edit
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No LOD 500 line items added yet. Use the Add Line Item form below to start building the estimation.
LOD 500 Total Sheets Manhours Man-months MM Value Total Price Hrs/Drawing Rate/Drawing Sheets/MM
Modeler 0 0 0.00 7,500 0.00 — — —
Coordinator 0 0 0.00 10,000 0.00 — — —
Mod + Coord 0 0 0.00 — 0.00 — — —
4D (Time & Schedule) Manhours Man-months MM Value Total Price
4D Specialist 1,584 9.00 7,500 67,500.00
Total 1,584 9.00 — 67,500.00
5D (Cost & Estimation) Manhours Man-months MM Value Total Price
5D Specialist 1,056 6.00 7,500 45,000.00
Total 1,056 6.00 — 45,000.00
Calc Mode
Man-month Based
Man-months Allocated
—
Man-month Value
—
GIS (Geographical Information System) uses man-month based entry. Enter hours per sheet directly for each line item.
No line items yet. Use the form below to add line items.
Add Line Item
Package
Select... Indoor Water Activity Olympic Pool
Sub-Package
Select... Basement Ground Level Roof Level
Discipline
Select... Architectural Structural MEP
Sub-Discipline
Select...
Sheet Category
Floor Plan Elevation Sections Enlarged Plan
Count
Size
Manual A0 A1
Complexity
Manual Level 1 (Low) Level 2 (Med) Level 3 (High)
Hrs/Sheet (manual)
Add Line Item
Reset
GIS Total Sheets Manhours Man-months MM Value Total Price Hrs/Drawing Rate/Drawing Sheets/MM
Modeler 0 0 0.00 — 0.00 — — —
Coordinator 0 0 0.00 — 0.00 — — —
Mod + Coord 0 0 0.00 — 0.00 — — —
BOQ is manually calculated: Manhours (manual entry) → Manmonths (auto) × Manmonth Value = Total Price
BOQ Manhours Man-months MM Value Total Cost
Total 0 0.00 6,000 $0.00
On-site BIM Management
Manhours
Man-months
MM Value
Total Price
BIM Manager
0
0.00
10,000
0.00
Total
0
0.00
—
0.00
Off-site BIM Management
Manhours
Man-months
MM Value
Total Price
BIM Manager
0
0.00
10,000
0.00
Total
0
0.00
—
0.00
Assumptions & Notes