Estimation Window
JES-2026-0051 · Aldar Properties
AK
JES-2026-0051
Aldar Properties
Saadiyat Grove Mixed-Use
New
RFQ Summary
RFQ Type:Tender
Priority:P2
Engineer:Ahmed K.
Currency:AED
Typology:Mixed-Use Development
Received:Mar 15, 2026
Deliverables in Scope
LOD 400
LOD 500
QTO
BEP
COBie
4D (Time & Schedule)
5D (Cost & Estimation)
GIS (Geographical Information System)
BOQ
On-site Modeler
On-site BIM Management
Off-site BIM Management
Revision
Rev:0
Internal:0
Timeline
Assigned:Mar 20
SLA Due:Mar 30
Days Left:6
📋 NEW ASSIGNMENT
Assigned by Raj Kumar (EM) · Mar 20, 2026
This is a new estimation assignment. Start by defining the package structure, then add line items for each deliverable. Review the NAS inputs folder for source drawings and specifications.
Package Structure
No packages defined yet. Start by creating your first package to define the project scope breakdown.
Modeler Parameters
Modeler Man-month Value AED 7,500
Rate / Hour AED 42.61
Days / Man-month 22
Coordinator Parameters
Coordination % 33%
Coordinator Man-month Value AED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
8 hrs
14 hrs
20 hrs
A1
6 hrs
12 hrs
16 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No line items added yet. Define your package structure above, then add line items using the form below.
Add Line Item
LOD 400Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.007,500AED 00.000.000.00
Coordinator00.0010,000AED 0
Mod + Coord000.00AED 00.000.00
Modeler Parameters
Modeler Man-month Value AED 3,500
Rate / Hour AED 19.89
Days / Man-month 22
Coordinator Parameters
Coordination % 15%
Coordinator Man-month Value AED 8,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
4 hrs
8 hrs
12 hrs
A1
3 hrs
6 hrs
8 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No line items added yet. Define your package structure above, then add line items using the form below.
Add Line Item
LOD 200Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.003,500AED 00.000.000.00
Coordinator00.008,000AED 0
Mod + Coord000.00AED 00.000.00
Modeler Parameters
Modeler Man-month Value AED 5,500
Rate / Hour AED 31.25
Days / Man-month 22
Coordinator Parameters
Coordination % 25%
Coordinator Man-month Value AED 9,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
6 hrs
11 hrs
16 hrs
A1
5 hrs
9 hrs
13 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No line items added yet. Define your package structure above, then add line items using the form below.
Add Line Item
LOD 300Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.005,500AED 00.000.000.00
Coordinator00.009,000AED 0
Mod + Coord000.00AED 00.000.00
Modeler Parameters
Modeler Man-month Value AED 6,750
Rate / Hour AED 38.41
Days / Man-month 22
Coordinator Parameters
Coordination % 30%
Coordinator Man-month Value AED 9,500
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
7 hrs
13 hrs
18 hrs
A1
5 hrs
11 hrs
14 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No line items added yet. Define your package structure above, then add line items using the form below.
Add Line Item
LOD 350Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.006,750AED 00.000.000.00
Coordinator00.009,500AED 0
Mod + Coord000.00AED 00.000.00
Modeler Parameters
Modeler Man-month ValueAED 8,000
Rate / HourAED 45.45
Days / Man-month22
Coordinator Parameters
Coordination %33%
Coordinator Man-month ValueAED 10,000
Hours per Sheet Rate Matrix
Size
Level 1 (Low)
Level 2 (Med)
Level 3 (High)
A0
10 hrs
18 hrs
24 hrs
A1
8 hrs
14 hrs
20 hrs
Manual
User-entered hrs/sheet — type-in field for exception cases
No line items added yet. Define your package structure above, then add line items using the form below.
Add Line Item
LOD 500Total SheetsManhoursMan-monthsMM ValueTotal PriceHrs/DrawingRate/DrawingSheets/MM
Modeler000.008,000AED 00.000.000.00
Coordinator00.0010,000AED 0
Mod + Coord000.00AED 00.000.00
QTO is manually calculated: Manhours (manual entry) → Manmonths (auto) × Manmonth Value = Total Price
QTOManhoursMan-monthsMM ValueTotal Cost
Total5002.846,000$17,040.00
BEP — Total Price is manual entry. Editable before, during & after completion.
BEPTotal Cost
Total$10,000.00
COBie is manually calculated: Manhours (manual entry) → Manmonths (auto) × Manmonth Value = Total Price
COBieManhoursMan-monthsMM ValueTotal Cost
Total00.005,000$0.00
Asset Data is manually calculated: Manhours (manual entry) → Manmonths (auto) × Manmonth Value = Total Price
Asset DataManhoursMan-monthsMM ValueTotal Cost
Total00.004,500$0.00
Formula: Resource × Duration × MM Value
4D (Time & Schedule)ManhoursMan-monthsMM ValueTotal Price
4D Specialist1,5849.007,50067,500.00
Total1,5849.0067,500.00
5D (Cost & Estimation)ManhoursMan-monthsMM ValueTotal Price
5D Specialist1,0566.007,50045,000.00
Total1,0566.0045,000.00
Modeler Parameters
Modeler Man-month ValueAED 7,500
Rate / HourAED 42.61
Days / Man-month22
Coordinator Parameters
Coordination %15%
Coordinator Man-month ValueAED 10,000

GIS (Geographical Information System) — manual entry for geospatial data estimation items.

No GIS line items added yet. Define your package structure above, then add line items.
BOQ is manually calculated: Manhours (manual entry) → Manmonths (auto) × Manmonth Value = Total Price
BOQManhoursMan-monthsMM ValueTotal Cost
Total00.006,000$0.00
Assumptions & Notes
Use this space to record key assumptions about the scope, complexity, or constraints that may affect the estimation.